Call-prep brief · checked 2026-07-09
RiverCities Transit (RCT)
Grade B · 80.3 / 100
Unchanged since 2026-07-08.
For this call: lead with the grade and the three fixes below, then confirm the feed is current and the NTD details line up. Each fix is framed as a next step, not a failure.
What changed since the last check
- Correctness no change
- Freshness no change
- Rider experience no change
Top three things to fix
Set wheelchair_boarding to 1 (accessible) or 2 (not accessible) for every stop. A field survey can start with the busiest stops.
262 of 262 stops don't say whether a wheelchair user can board there. Riders who use wheelchairs can't plan a trip when accessibility is marked 'unknown'; apps show no information at all.
Effort: A column in stops.txt; your scheduling software likely has it.
Set wheelchair_accessible on every trip (most small-agency fleets are 100% accessible, so this is often a single default).
201 of 201 trips don't say whether the vehicle is wheelchair accessible. Even with accessible stops, riders need to know the bus itself can take them.
Effort: Often one default setting in your export.
Agencies here usually clear this within about 1 week (based on 5 observed fixes).
Use mixed case for stop names and headsigns (e.g. 'Main St & 2nd Ave', not 'MAIN ST & 2ND AVE').
Some rider-facing names are in ALL CAPS or all lowercase. ALL-CAPS stop and headsign names are harder to read in apps and are read awkwardly by screen readers.
Effort: Often a bulk fix in your scheduling software.
NTD certification readiness: Ready
This feed looks ready for your NTD certification: published at a public URL, valid, and current. The official check is still your D-10 certification.
- Published Ready
- Published at a public URL.
- Valid Ready
- Passes validation with no errors.
- Current Ready
- Service data covers the next 156 days.
agency_id and NTD ID: Not checked yet. Setting your GTFS agency_id to your five-digit NTD ID is an optional way to line a feed up with its National Transit Database record. FTA links the two on your P-50 form, so it is not a required feed change. We don't have your NTD ID on file, so this is not checked yet.
The bar this score answers to
The state transit-data program is WSDOT Transportation Data. WSDOT builds and publishes GTFS for Washington transit agencies.
Key facts
- Feed URL
- https://data.trilliumtransit.com/gtfs/rivercitiestransit-wa-us/rivercitiestransit-wa-us.zip
- Last checked
- 2026-07-09
- Service window
- 144 days of service data remain. Last service date 2026-11-30.
- Feed version
- UTC: 13-May-2026 14:03
- State
- Washington
Part of the Washington portfolio: see where this agency sits among the state's feeds before the call.
A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.1, validator 8.0.1.