← Back to the full scorecard

Call-prep brief · checked 2026-07-09

Bustang

Grade C · 73.4 / 100

Unchanged since 2026-07-08.

For this call: lead with the grade and the three fixes below, then confirm the feed is current and the NTD details line up. Each fix is framed as a next step, not a failure.

What changed since the last check

  • Correctness no change
  • Freshness no change
  • Rider experience no change

Top three things to fix

  1. Review the rule documentation for 'foreign_key_violation' at https://gtfs-validator.mobilitydata.org/rules.html and check the flagged rows in your feed.

    Foreign key violation (flagged by the MobilityData validator). See the linked rule for what this affects.

    Effort: Varies.

  2. Set wheelchair_accessible on every trip (most small-agency fleets are 100% accessible, so this is often a single default).

    254 of 254 trips don't say whether the vehicle is wheelchair accessible. Even with accessible stops, riders need to know the bus itself can take them.

    Effort: Often one default setting in your export.

    Agencies here usually clear this within about 1 week (based on 5 observed fixes).

  3. Turn on 'remove unused shapes' (or the like) in your export tool.

    The feed contains route shapes no trip uses. Harmless to riders, but it bloats the feed and suggests stale export data.

    Effort: One setting.

NTD certification readiness: Needs attention

This feed is close to NTD-ready. 1 validator error to resolve.

Published Ready
Published at a public URL.
Valid Needs attention
1 validator error to resolve.
Current Ready
Service data covers the next 80 days.

agency_id and NTD ID: Not checked yet. Setting your GTFS agency_id to your five-digit NTD ID is an optional way to line a feed up with its National Transit Database record. FTA links the two on your P-50 form, so it is not a required feed change. We don't have your NTD ID on file, so this is not checked yet.

The bar this score answers to

The state transit-data program is CDOT Digital Transit Mobility. Colorado's program coordinating GTFS data across transit providers.

Key facts

Feed URL
https://www.rtd-denver.com/files/gtfs/bustang-co-us.zip
Last checked
2026-07-09
Service window
79 days of service data remain. Last service date 2026-09-26.
Feed version
Jun26-36807-13-20-20260708-034843
State
Colorado

Part of the Colorado portfolio: see where this agency sits among the state's feeds before the call.

A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.1, validator 8.0.1.