← Back to the full scorecard

Call-prep brief · checked 2026-11-21

Pierce Transit

Grade C · 71.5 / 100

Down 0.4 points since 2026-11-20 (C to C).

For this call: lead with the grade and the three fixes below, then confirm the feed is current and the NTD details line up. Each fix is framed as a next step, not a failure.

What changed since the last check

  • Correctness no change
  • Freshness down 1.7
  • Rider experience no change

Top three things to fix

  1. Re-export with a validity window that reaches at least 60 days out.

    Service data runs out in 21 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice.

    This one is about the feed as a whole, so there is no share of it to count.

    Effort: One export setting.

  2. Review the rule documentation for 'missing_required_agency_id' at https://gtfs-validator.mobilitydata.org/rules.html and check the flagged rows in your feed.

    Missing required agency id (flagged by the MobilityData validator). See the linked rule for what this affects.

    This is a validator notice, and the validator decides what each instance covers, so no share of the network can be read from it here.

    Effort: Varies.

  3. Set wheelchair_accessible on every trip. If every vehicle is accessible, this may be one default; otherwise use the value for each trip.

    8900 of 8912 trips don't say whether the vehicle is wheelchair accessible. Even with accessible stops, riders need to know the bus itself can take them.

    Fixing this covers 8,900 of 8,912 trips, nearly all of them.

    Effort: A default or per-trip field in your export.

Riders and need behind these fixes

  • This feed carries no National Transit Database ID, so annual rider-trips are not known for it.
  • Washington as a whole measures lower on transit need. That is a statewide reading, not one for this feed's service area. Source: US Census ACS 5-year 2022, statewide overlay, as of 2026-11-02.

These describe this feed only. They do not rank agencies, and they do not change the grade or the order of the fixes.

Finding handoff

Move one finding to a recheck

Select one finding. Copy the request, make the change in the feed-producing tool, then compare the next complete run.

Feed evidence
Service data runs out in 21 day(s).
Next action
Re-export with a validity window that reaches at least 60 days out.
Recheck
Publish the changed feed at the same URL. On the next complete, comparable scorecard run, confirm that this finding is no longer reported.
Copy handoff text

Ready to send to the agency

Hi Pierce Transit team, Service data runs out in 21 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice. The fix is usually one export setting: Re-export with a validity window that reaches at least 60 days out. This came from your GTFS data quality scorecard, which checks the feed you publish and lists the fixes in plain language: https://gtfsscorecard.org/agency/pierce-transit/

Copy this note from the full scorecard.

NTD GTFS readiness: Needs attention

This feed is close to NTD-ready. 1 validator error to resolve. Service data runs out in 21 days; renew before you certify.

Published Ready
Published at a public URL.
Valid Needs attention
1 validator error to resolve.
Current Needs attention
Service data runs out in 21 days; renew before you certify.
agency_id provided Ready
agency.txt provides agency_id. For RY2026, keep one stable value for each NTD reporter represented in the feed and crosswalk each value on the P-50 form.

agency_id equals NTD ID (optional): Not checked yet. This feed provides agency_id. For RY2026, keep one stable value for each NTD reporter represented in the feed and crosswalk it on the P-50 form. The value does not need to equal the five-digit NTD ID; we do not have that ID on file, so the optional equality comparison is not checked yet.

The bar this score answers to

A local transit-data support resource is WSDOT Transportation Data. WSDOT builds and publishes GTFS for Washington transit agencies.

Key facts

Feed URL
https://gtfs.sound.obaweb.org/prod/3_gtfs.zip
Last checked
2026-11-21
Service window
21 days of service data remain. Last service date 2026-12-12.
Feed version
S1000138
Location
Washington

Part of the Washington portfolio: see where this agency sits among the other feeds in that group before the call.

A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.5, validator 8.0.1.