← Back to the full scorecard

Call-prep brief · checked 2026-11-21

Metropolitan Atlanta Rapid Transit Authority (MARTA)

Grade F · 52.1 / 100

Unchanged since 2026-11-20.

For this call: lead with the grade and the three fixes below, then confirm the feed is current and the NTD details line up. Each fix is framed as a next step, not a failure.

What changed since the last check

  • Correctness no change
  • Freshness down 1.7
  • Rider experience no change
  • Realtime quality up 1.8

Top three things to fix

  1. Re-export with a validity window that reaches at least 60 days out.

    Service data runs out in 20 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice.

    This one is about the feed as a whole, so there is no share of it to count.

    Effort: One export setting.

  2. Ask your AVL vendor to check that every vehicle assignment reaches TripUpdates. School-day and tripper runs are the ones most often left out.

    109 of 229 trips scheduled during the sampling window had no live predictions. Riders on those trips get schedule times labeled as live. Caltrans asks that every trip you run shows up in TripUpdates.

    This was measured over a realtime sampling window, so it has no feed-wide share.

    Effort: A vendor data-mapping question.

  3. Add feed_info.txt with feed_start_date and feed_end_date to your export.

    feed_info.txt is missing its start/end dates (the file itself is absent) Apps and this scorecard can't warn anyone before the feed goes stale without stated validity dates.

    This one is about the feed as a whole, so there is no share of it to count.

    Effort: Two fields, set once in export settings.

Riders and need behind these fixes

  • This feed carries no National Transit Database ID, so annual rider-trips are not known for it.
  • Georgia as a whole measures lower on transit need. That is a statewide reading, not one for this feed's service area. Source: US Census ACS 5-year 2022, statewide overlay, as of 2026-11-02.

These describe this feed only. They do not rank agencies, and they do not change the grade or the order of the fixes.

Finding handoff

Move one finding to a recheck

Select one finding. Copy the request, make the change in the feed-producing tool, then compare the next complete run.

Feed evidence
Service data runs out in 20 day(s).
Next action
Re-export with a validity window that reaches at least 60 days out.
Recheck
Publish the changed feed at the same URL. On the next complete, comparable scorecard run, confirm that this finding is no longer reported.
Copy handoff text

Ready to send to the agency

Hi Metropolitan Atlanta Rapid Transit Authority (MARTA) team, Service data runs out in 20 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice. The fix is usually one export setting: Re-export with a validity window that reaches at least 60 days out. This came from your GTFS data quality scorecard, which checks the feed you publish and lists the fixes in plain language: https://gtfsscorecard.org/agency/metropolitan-atlanta-rapid-transit-authority-marta/

Copy this note from the full scorecard.

NTD GTFS readiness: Needs attention

This feed is close to NTD-ready. Service data runs out in 20 days; renew before you certify.

Published Ready
Published at a public URL.
Valid Ready
Passes validation with no errors.
Current Needs attention
Service data runs out in 20 days; renew before you certify.
agency_id provided Ready
agency.txt provides agency_id. For RY2026, keep one stable value for each NTD reporter represented in the feed and crosswalk each value on the P-50 form.

agency_id equals NTD ID (optional): Not checked yet. This feed provides agency_id. For RY2026, keep one stable value for each NTD reporter represented in the feed and crosswalk it on the P-50 form. The value does not need to equal the five-digit NTD ID; we do not have that ID on file, so the optional equality comparison is not checked yet.

Key facts

Feed URL
https://www.itsmarta.com/google_transit_feed/google_transit.zip
Last checked
2026-11-21
Service window
20 days of service data remain. Last service date 2026-12-11.
Location
Georgia

Part of the Georgia portfolio: see where this agency sits among the other feeds in that group before the call.

A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.5, validator 8.0.1.