← Back to the full scorecard

Call-prep brief · checked 2026-07-09

METRO Houston

Grade F · 41.0 / 100

Down 0.4 points since 2026-07-08 (F to F).

For this call: lead with the grade and the three fixes below, then confirm the feed is current and the NTD details line up. Each fix is framed as a next step, not a failure.

What changed since the last check

  • Correctness no change
  • Freshness down 1.7
  • Rider experience no change

Top three things to fix

  1. Re-export with a validity window that reaches at least 60 days out.

    Service data runs out in 2 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice.

    Effort: One export setting.

    Agencies here usually clear this within about 1 week (based on 61 observed fixes).

  2. Set wheelchair_boarding to 1 (accessible) or 2 (not accessible) for every stop. A field survey can start with the busiest stops.

    8671 of 8794 stops don't say whether a wheelchair user can board there. Riders who use wheelchairs can't plan a trip when accessibility is marked 'unknown'; apps show no information at all.

    Effort: A column in stops.txt; your scheduling software likely has it.

  3. Use mixed case for stop names and headsigns (e.g. 'Main St & 2nd Ave', not 'MAIN ST & 2ND AVE').

    Some rider-facing names are in ALL CAPS or all lowercase. ALL-CAPS stop and headsign names are harder to read in apps and are read awkwardly by screen readers.

    Effort: Often a bulk fix in your scheduling software.

Ready to send to the agency

Hi METRO Houston team, Service data runs out in 2 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice. The fix is usually one export setting: Re-export with a validity window that reaches at least 60 days out. This came from your GTFS data quality scorecard, which checks the feed you publish and lists the fixes in plain language: https://gtfsscorecard.org/agency/metro-houston-2060/

Copy this note from the full scorecard.

NTD certification readiness: Needs attention

This feed is close to NTD-ready. Service data runs out in 14 days; renew before you certify.

Published Ready
Published at a public URL.
Valid Ready
Passes validation with no errors.
Current Needs attention
Service data runs out in 14 days; renew before you certify.

agency_id and NTD ID: Not checked yet. Setting your GTFS agency_id to your five-digit NTD ID is an optional way to line a feed up with its National Transit Database record. FTA links the two on your P-50 form, so it is not a required feed change. We don't have your NTD ID on file, so this is not checked yet.

Key facts

Feed URL
https://metro.resourcespace.com/pages/download.php?ref=4835&ext=zip
Last checked
2026-07-09
Service window
2 days of service data remain. Last service date 2026-07-25.
Feed version
FIFA2026IVOMS_20260612
State
Texas

Part of the Texas portfolio: see where this agency sits among the state's feeds before the call.

A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.1, validator 8.0.1.