← Back to the full scorecard

Call-prep brief · checked 2026-07-09

Light Rail

Grade C · 70.7 / 100

Down 4.2 points since 2026-07-08 (C to C).

For this call: lead with the grade and the three fixes below, then confirm the feed is current and the NTD details line up. Each fix is framed as a next step, not a failure.

What changed since the last check

  • Correctness up 4.5
  • Freshness down 15.0
  • Rider experience down 7.5

Fixed since the last check (3 findings):

  • Stops match shape out of order (flagged by the MobilityData validator). (stops_match_shape_out_of_order)
  • Some service calendars have no days of the week switched on. (service_has_no_active_day_of_the_week)
  • Feed valid beyond total service window (flagged by the MobilityData validator). (feed_valid_beyond_total_service_window)

Top three things to fix

  1. Add feed_info.txt with feed_start_date and feed_end_date to your export.

    feed_info.txt is missing its start/end dates (the file itself is absent) Apps and this scorecard can't warn anyone before the feed goes stale without stated validity dates.

    Effort: Two fields, set once in export settings.

    Agencies here usually clear this within about 1 week (based on 16 observed fixes).

  2. Set wheelchair_boarding to 1 (accessible) or 2 (not accessible) for every stop. A field survey can start with the busiest stops.

    67 of 161 stops don't say whether a wheelchair user can board there. Riders who use wheelchairs can't plan a trip when accessibility is marked 'unknown'; apps show no information at all.

    Effort: A column in stops.txt; your scheduling software likely has it.

  3. Use mixed case for stop names and headsigns (e.g. 'Main St & 2nd Ave', not 'MAIN ST & 2ND AVE').

    Some rider-facing names are in ALL CAPS or all lowercase. ALL-CAPS stop and headsign names are harder to read in apps and are read awkwardly by screen readers.

    Effort: Often a bulk fix in your scheduling software.

NTD certification readiness: Ready

Published at a public URL, valid, and current: the three things the NTD GTFS requirement asks of a feed all hold here. Only your own D-10 certification makes that official; this is a heads-up, not a determination.

Published Ready
Published at a public URL.
Valid Ready
Passes validation with no errors.
Current Ready
Service data covers the next 175 days.

agency_id and NTD ID: Not checked yet. Setting your GTFS agency_id to your five-digit NTD ID is an optional way to line a feed up with its National Transit Database record. FTA links the two on your P-50 form, so it is not a required feed change. We don't have your NTD ID on file, so this is not checked yet.

Key facts

Feed URL
https://mdotmta-gtfs.s3.amazonaws.com/mdotmta_gtfs_lightrail.zip
Last checked
2026-07-09
Service window
175 days of service data remain. Last service date 2026-12-31.
State
Maryland

Part of the Maryland portfolio: see where this agency sits among the state's feeds before the call.

A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.1, validator 8.0.1.