← Back to the full scorecard

Call-prep brief · checked 2026-08-01

Marin Transit

Grade D · 66.2 / 100

Down 0.3 points since 2026-07-31 (D to D).

For this call: lead with the grade and the three fixes below, then confirm the feed is current and the NTD details line up. Each fix is framed as a next step, not a failure.

What changed since the last check

  • Correctness no change
  • Freshness down 1.6
  • Rider experience no change
  • Realtime quality no change

Top three things to fix

  1. Check the trip updates endpoint with your AVL vendor; it should return a fresh GTFS-Realtime protobuf on every request.

    The trip updates realtime feed failed during sampling. When this feed is down, riders see scheduled times presented as if they were live.

    Effort: Usually a vendor support ticket.

  2. Check the vehicle positions endpoint with your AVL vendor; it should return a fresh GTFS-Realtime protobuf on every request.

    The vehicle positions realtime feed failed during sampling. When this feed is down, riders see scheduled times presented as if they were live.

    Effort: Usually a vendor support ticket.

  3. Check the service alerts endpoint with your AVL vendor; it should return a fresh GTFS-Realtime protobuf on every request.

    The service alerts realtime feed failed during sampling. When this feed is down, riders see scheduled times presented as if they were live.

    Effort: Usually a vendor support ticket.

Finding handoff

Move one finding to a recheck

Select one finding. Copy the request, make the change in the feed-producing tool, then compare the next complete run.

Feed evidence
The trip updates realtime feed failed during sampling.
Next action
Check the trip updates endpoint with your AVL vendor; it should return a fresh GTFS-Realtime protobuf on every request.
Recheck
Publish the changed feed at the same URL. On the next complete, comparable scorecard run, confirm that this finding is no longer reported.
Copy handoff text

NTD GTFS readiness: Needs attention

This feed is close to NTD-ready. 1 validator error to resolve.

Published Ready
Published at a public URL.
Valid Needs attention
1 validator error to resolve.
Current Ready
Service data covers the next 43 days.
agency_id provided Ready
agency.txt provides agency_id. For RY2026, keep one stable value for each NTD reporter represented in the feed and crosswalk each value on the P-50 form.

agency_id equals NTD ID (optional): Different (allowed). Your feed's agency_id is 33; your National Transit Database ID is 90234. A feed that serves several agencies (a shared regional feed) can legitimately carry more than one agency_id. The values do not need to equal the five-digit NTD ID, so this difference is allowed and carries no score. Confirm that P-50 crosswalks agency_id 33 to NTD ID 90234, and keep the feed value stable. Do not change it solely to make the two values equal.

The bar this score answers to

The published guideline in California is California Transit Data Guidelines. Caltrans' published quality guidelines and compliance checklist; this rubric is anchored to them.

Key facts

Feed URL
https://marintransit.gov/data/google_transit.zip
Last checked
2026-08-01
Service window
43 days of service data remain. Last service date 2026-09-13.
Feed version
UTC: 04-Feb-2026 00:08
Location
California

Part of the California portfolio: see where this agency sits among the state's feeds before the call.

A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.3, validator 8.0.1.