Call-prep brief · checked 2026-07-11
Washington Park Shuttle
Grade F · 58.2 / 100
Down 0.3 points since 2026-07-10 (F to F).
For this call: lead with the grade and the three fixes below, then confirm the feed is current and the NTD details line up. Each fix is framed as a next step, not a failure.
What changed since the last check
- Correctness no change
- Freshness down 1.7
- Rider experience no change
- Realtime quality no change
Top three things to fix
Re-export with a validity window that reaches at least 60 days out.
Service data runs out in 27 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice.
Effort: One export setting.
Check the trip updates endpoint with your AVL vendor; it should return a fresh GTFS-Realtime protobuf on every request.
The trip updates realtime feed failed during sampling. When this feed is down, riders see scheduled times presented as if they were live.
Effort: Usually a vendor support ticket.
Check the vehicle positions endpoint with your AVL vendor; it should return a fresh GTFS-Realtime protobuf on every request.
The vehicle positions realtime feed failed during sampling. When this feed is down, riders see scheduled times presented as if they were live.
Effort: Usually a vendor support ticket.
Ready to send to the agency
Hi Washington Park Shuttle team, Service data runs out in 27 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice. The fix is usually one export setting: Re-export with a validity window that reaches at least 60 days out. Your feed is produced by Trillium, so the quickest path is usually forwarding this to your Trillium contact. This came from your GTFS data quality scorecard, which checks the feed you publish and lists the fixes in plain language: https://gtfsscorecard.org/agency/washington-park-shuttle-254/
NTD GTFS readiness: Ready
This feed looks ready for your NTD certification: published at a public URL, valid, and current. The official check is still your D-10 certification.
- Published Ready
- Published at a public URL.
- Valid Ready
- Passes validation with no errors.
- Current Ready
- Service data covers the next 38 days.
agency_id and NTD ID: Not checked yet. Setting your GTFS agency_id to your five-digit NTD ID is an optional way to line a feed up with its National Transit Database record. FTA links the two on your P-50 form, so it is not a required feed change. We don't have your NTD ID on file, so this is not checked yet.
Key facts
- Feed URL
- https://oregon-gtfs.trilliumtransit.com/gtfs_data/washingtonparkshuttle-or-us/washingtonparkshuttle-or-us.zip
- Last checked
- 2026-07-11
- Service window
- 27 days of service data remain. Last service date 2026-08-07.
- Feed version
- UTC: 29-Jun-2026 20:47
A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.1, validator 8.0.1.