Fix log: Mountain Line Transit
A dated record of every data issue this feed has cleared since tracking began. Each entry keeps its own link, so a specific fix can be cited in a board packet, a grant report, or an NTD narrative.
5 verified fixes
- 2 of 15 trips scheduled during the sampling window had no live predictions. (scorecard_rt_trip_coverage) Reported through 2026-07-01; the 2026-07-02 check verified it gone. What this finding means. Link
- 6 of 26 sampled vehicle positions were far from their assigned route (worst: 5862 m). (scorecard_rt_vehicles_off_route) Reported through 2026-06-27; the 2026-06-28 check verified it gone. Link
- 1 of 7 trips scheduled during the sampling window had no live predictions. (scorecard_rt_trip_coverage) Reported through 2026-06-27; the 2026-06-28 check verified it gone. What this finding means. Link
- 3 of 17 trips scheduled during the sampling window had no live predictions. (scorecard_rt_trip_coverage) Reported through 2026-06-23; the 2026-06-24 check verified it gone. What this finding means. Link
- 1 of 7 trips scheduled during the sampling window had no live predictions. (scorecard_rt_trip_coverage) Reported through 2026-06-21; the 2026-06-22 check verified it gone. What this finding means. Link
Verified means the daily check stopped reporting the finding. A finding that returns and clears again appears as a separate entry.
This log is the end of the guided fix loop: you make a change, republish, and the next run verifies it and records it here as linkable proof for a board packet or NTD narrative.