Call-prep brief · checked 2026-08-02
moova (Vesoul)
Grade F · 28.2 / 100
Down 0.4 points since 2026-08-01 (F to F).
For this call: lead with the grade and the three fixes below, then confirm the feed is current and the rider information is complete. Each fix is framed as a next step, not a failure.
What changed since the last check
- Correctness no change
- Freshness down 1.7
- Rider experience no change
Top three things to fix
Re-export with a validity window that reaches at least 60 days out.
Service data runs out in 29 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice.
Effort: One export setting.
Review the rule documentation for 'foreign_key_violation' at https://gtfs-validator.mobilitydata.org/rules.html and check the flagged rows in your feed.
Foreign key violation (flagged by the MobilityData validator). See the linked rule for what this affects.
Effort: Varies.
Review the rule documentation for 'trip_distance_exceeds_shape_distance' at https://gtfs-validator.mobilitydata.org/rules.html and check the flagged rows in your feed.
Trip distance exceeds shape distance (flagged by the MobilityData validator). See the linked rule for what this affects.
Effort: Varies.
Finding handoff
Move one finding to a recheck
Select one finding. Copy the request, make the change in the feed-producing tool, then compare the next complete run.
- Feed evidence
- Service data runs out in 29 day(s).
- Next action
- Re-export with a validity window that reaches at least 60 days out.
- Recheck
- Publish the changed feed at the same URL. On the next complete, comparable scorecard run, confirm that this finding is no longer reported.
Copy handoff text
- Feed evidence
- Foreign key violation (flagged by the MobilityData validator).
- Next action
- Review the rule documentation for 'foreign_key_violation' at https://gtfs-validator.mobilitydata.org/rules.html and check the flagged rows in your feed.
- Recheck
- Publish the changed feed at the same URL. On the next complete, comparable scorecard run, confirm that this finding is no longer reported.
Copy handoff text
- Feed evidence
- Trip distance exceeds shape distance (flagged by the MobilityData validator).
- Next action
- Review the rule documentation for 'trip_distance_exceeds_shape_distance' at https://gtfs-validator.mobilitydata.org/rules.html and check the flagged rows in your feed.
- Recheck
- Publish the changed feed at the same URL. On the next complete, comparable scorecard run, confirm that this finding is no longer reported.
Copy handoff text
Ready to send to the agency
Hi moova (Vesoul) team, Service data runs out in 29 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice. The fix is usually one export setting: Re-export with a validity window that reaches at least 60 days out. This came from your GTFS data quality scorecard, which checks the feed you publish and lists the fixes in plain language: https://gtfsscorecard.org/agency/moova-vesoul/
Key facts
- Feed URL
- https://transport.data.gouv.fr/resources/81222/download
- Last checked
- 2026-08-02
- Service window
- 29 days of service data remain. Last service date 2026-08-31.
- Location
- Bourgogne-Franche-Comté, France
A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.3, validator 8.0.1.