← Back to the full scorecard

Call-prep brief · checked 2026-08-02

Ritmo (Haguenau)

Grade F · 44.9 / 100

Down 0.4 points since 2026-08-01 (F to F).

For this call: lead with the grade and the three fixes below, then confirm the feed is current and the rider information is complete. Each fix is framed as a next step, not a failure.

What changed since the last check

  • Correctness no change
  • Freshness down 1.7
  • Rider experience no change

Top three things to fix

  1. Re-export with a validity window that reaches at least 60 days out.

    Service data runs out in 29 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice.

    Effort: One export setting.

  2. Review the rule documentation for 'invalid_url' at https://gtfs-validator.mobilitydata.org/rules.html and check the flagged rows in your feed.

    Invalid url (flagged by the MobilityData validator). See the linked rule for what this affects.

    Effort: Varies.

  3. Set wheelchair_boarding to 1 (accessible) or 2 (not accessible) for every stop. A field survey can start with the busiest stops.

    462 of 533 stops don't say whether a wheelchair user can board there. Riders who use wheelchairs can't plan a trip when accessibility is marked 'unknown'; apps show no information at all.

    Effort: A column in stops.txt; your scheduling software likely has it.

Finding handoff

Move one finding to a recheck

Select one finding. Copy the request, make the change in the feed-producing tool, then compare the next complete run.

Feed evidence
Service data runs out in 29 day(s).
Next action
Re-export with a validity window that reaches at least 60 days out.
Recheck
Publish the changed feed at the same URL. On the next complete, comparable scorecard run, confirm that this finding is no longer reported.
Copy handoff text

Ready to send to the agency

Hi Ritmo (Haguenau) team, Service data runs out in 29 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice. The fix is usually one export setting: Re-export with a validity window that reaches at least 60 days out. This came from your GTFS data quality scorecard, which checks the feed you publish and lists the fixes in plain language: https://gtfsscorecard.org/agency/ritmo-haguenau/

Copy this note from the full scorecard.

Key facts

Feed URL
https://transport.data.gouv.fr/resources/80449/download
Last checked
2026-08-02
Service window
29 days of service data remain. Last service date 2026-08-31.
Feed version
1765353403408
Location
Grand-Est, France

A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.3, validator 8.0.1.