Call-prep brief · checked 2026-09-13
ATM Milano (Comune di Milano)
Grade F · 52.7 / 100
Down 0.5 points since 2026-09-12 (F to F).
For this call: lead with the grade and the three fixes below, then confirm the feed is current and the rider information is complete. Each fix is framed as a next step, not a failure.
What changed since the last check
- Correctness no change
- Freshness down 1.6
- Rider experience no change
Top three things to fix
Re-export with a validity window that reaches at least 60 days out.
Service data runs out in 22 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice.
Effort: One export setting.
Set wheelchair_accessible on every trip. If every vehicle is accessible, this may be one default; otherwise use the value for each trip.
114391 of 114391 trips don't say whether the vehicle is wheelchair accessible. Even with accessible stops, riders need to know the transit vehicle itself can take them.
Effort: A default or per-trip field in your export.
Add feed_info.txt with feed_start_date and feed_end_date to your export.
feed_info.txt is missing its start/end dates Apps and this scorecard can't warn anyone before the feed goes stale without stated validity dates.
Effort: Two fields, set once in export settings.
Finding handoff
Move one finding to a recheck
Select one finding. Copy the request, make the change in the feed-producing tool, then compare the next complete run.
- Feed evidence
- Service data runs out in 22 day(s).
- Next action
- Re-export with a validity window that reaches at least 60 days out.
- Recheck
- Publish the changed feed at the same URL. On the next complete, comparable scorecard run, confirm that this finding is no longer reported.
Copy handoff text
- Feed evidence
- 114391 of 114391 trips don't say whether the vehicle is wheelchair accessible.
- Next action
- Set wheelchair_accessible on every trip. If every vehicle is accessible, this may be one default; otherwise use the value for each trip.
- Recheck
- Publish the changed feed at the same URL. On the next complete, comparable scorecard run, confirm that this finding is no longer reported.
Copy handoff text
- Feed evidence
- feed_info.txt is missing its start/end dates
- Next action
- Add feed_info.txt with feed_start_date and feed_end_date to your export.
- Recheck
- Publish the changed feed at the same URL. On the next complete, comparable scorecard run, confirm that this finding is no longer reported.
Copy handoff text
Ready to send to the agency
Hi ATM Milano (Comune di Milano) team, Service data runs out in 22 day(s). When the calendar runs out, trip planners stop showing this agency. Fixing it now is calmer than after riders notice. The fix is usually one export setting: Re-export with a validity window that reaches at least 60 days out. This came from your GTFS data quality scorecard, which checks the feed you publish and lists the fixes in plain language: https://gtfsscorecard.org/agency/atm-milano/
Key facts
- Feed URL
- https://dati.comune.milano.it/gtfs.zip
- Last checked
- 2026-09-13
- Service window
- 22 days of service data remain. Last service date 2026-10-05.
- Feed version
- 421
- Location
- Lombardia, Italy
Part of the Italy portfolio: see where this agency sits among the other feeds in that group before the call.
A data-quality and completeness read to support an agency conversation. Not an official compliance determination. Rubric v1.3, validator 8.0.1.